红河州现有总装机容量400万千瓦,电力将有较大的富佘量。已形成以22万伏为主网架,11万伏为骨干的多电源、多层次的供电网络。
全州将尽快形成550万千瓦左右的装机能力,成为“云电外送”的重要区域。
在完善国内送电的同时,探索向越送电的方式和途径,搞好煤焦开发,使红河州成为昆河经济走廊的综合能源基地。
|
Now Honghe Prefecture has the total installed capacity of 4,000,000kw,with large surplus of electric power.
lt has formed the multi-power source and multi-level power supply network with the main grid of 220,000v and the trunk of 110,000v.
The prefecture will form the installed capacity of about 5,500,000v as soon as possible to become an important area of "power transmission from Yunnan to other places".
While optimizing the domestic power transmission,and developing the power transmitting method and channel,and updating the coal and coke devlopment,to make Honghe Prefecture an integrated energy base along the Kunming and Hanoi Economic Corridor. |